The picture illustrates the process of electricity manufacture in a hydroelectric power station.
It is clear that the process involves various stages beginning with water flow in high-level reservoir and ending with electricity in power lines to the national grid.
Looking at first step of the process, river water stored in high-level reservoir which is blocked by a dam. Following this, an intake at the bottom of this dam which is opened in day to allows the flow of water to generate electricity and closed at night to the water flows out into the river below the dam during pumping.
In day, water flow to generating electricity by an operate generator in a power station then it is moved in power lines to national grid. By contrast, water from low-level reservoir will be pumped into high-level reservoir during the night to ready for day time activities.
- The bar chart below shows the amount of money invested in each categories from five organizations 73
- People drinks more and more sugar based drinks What is the reason for tgat What can be done for that 73
- The graph below shows the number of tourists visiting a particular Caribbean island between 2010 and 2017 Summarise the information by selecting and reporting the main features and make comparisons where relevant 73
- The two maps below show road access to a city hospital in 2007 and in 2010 Summarise the information by selecting and reporting the main features and make comparisons where relevant 61
- Governments should spend money on railways rather than roads To what extent do you agree or disagree 73