The flowchart portrays consecutive stages of how construction bricks are produced.
Overall, it is obvious that there are seven steps in the bricks procedure, beginning with collecting fresh clay and ending with transporting the end products to the market. Two main ingredients are required in brick production.
As is presented in the flow diagram, it is obvious that natural clay, which is below the ground, is dug out of the ground by a digger machine. After that, this clay is placed onto a metal grid and is filtered and processed by a roller into small chunks. This smashed clay is then mixed with sand and water, and then, this mixture is either put in a mould or put through a die which is then cut by a wire cutter to form column bricks of the same size.
In the next stage of bricks production, we can also see that the brick-shaped is put in a drying oven for one or two days. After that, these dried bricks are heated in a kiln at a moderate temperature (200 – 980 degree Celsius) before placing them in a kiln at a higher temperature up to 1300C. Consequently, bricks are cooled in a cooling chamber for two or three days, before being packaged and delivered to construction sites for building purposes.
- The diagram below shows the recycling process of plastics Summarise the information by selecting and reporting the main features and make comparisons where relevant 78
- The diagram below shows the process by which bricks are manufactured for the building industry Summarise the information by selecting and reporting the main features and make comparisons where relevant
- The most effective way to solve the current traffic and pollution problems in cities is to encourage people to move from the suburbs or the countryside into the city centre To what extent do you agree or disagree 73
- You should spend about 20 minutes on this task The bar chart below describes some changes about the percentage of people were born in Australia and who were born outside Australia living in urban rural and town between 1995 and 2010 Summarise the informat 73
- The bar chart shows the number of hours worked by men women per week in Australia in 2007 Summarise information by selecting and reporting main features and make comparisons where relevant 78