The diagrams below show the life cycle of the silkworm and the stages in the production of silk cloth.
According to the cycle in the life of the silkworm. There are four main stage process to produce used-cocoons for the production of the silk cloth.
First of all, The moth, adult phase of silkworm, produces amount of eggs. Those eggs take ten days to crack and become a silkworm larva’s age lasts up four to six weeks until the larva wrap a cocoon of silk thread around it self. There after three to six days, the precious cocoon is ready picked up by silk cloth production.
Selected cocoon are boiled in water to produce lack of threads. Those threads are extensible in the unwinding stage which reach 300-900 meters long. Formerly output is twisted inside a large pan. The result is dyed which became interested-colored threads. Last, it is weaved to be complete silk cloth.
Over all, the diagram provides information regarding on long term process in the silk cloth.
- The bar chart below illustrates the use of tobacco products by secondary school students in the United States. 67
- The tables below give information about sales of Fairtrade labelled coffee and bananas in 1999 and 2004 in five European countries Summarise the information 87
- the three pie charts below shows the changes in annual spending by a particular UK school in 1981, 1991, and 2011 60
- The map below is of the town of Garlsdon. A new supermarket (S) is planned for the town. The map shows two possible sites for the supermarket. 60
- Some people think that all university students should study whether they like. Others believe that they should only be allowed to study subjects that will be useful in the future, such as those related to science and technology. Discuss both these views a 60
and become a silkworm larva’s age lasts up four to six weeks until the larva wrap a cocoon
and become a silkworm larva’s age which lasts up four to six weeks until the larva wraps a cocoon
in the unwinding stage which reach 300-900 meters long
in the unwinding stage which reaches 300-900 meters long
regarding on long term process
regarding on a long term process
Attribute Value Ideal
Score: 6.0 out of 9
Category: Satisfactory Excellent
No. of Grammatical Errors: 3 2
No. of Spelling Errors: 0 2
No. of Sentences: 11 10
No. of Words: 151 200
No. of Characters: 701 1000
No. of Different Words: 91 100
Fourth Root of Number of Words: 3.505 4.0
Average Word Length: 4.642 4.6
Word Length SD: 2.477 2.4
No. of Words greater than 5 chars: 44 60
No. of Words greater than 6 chars: 29 50
No. of Words greater than 7 chars: 18 40
No. of Words greater than 8 chars: 9 20
Use of Passive Voice (%): 0 0
Avg. Sentence Length: 13.727 21.0
Sentence Length SD: 6.224 7.5
Use of Discourse Markers (%): 0.182 0.12
Sentence-Text Coherence: 0.356 0.35
Sentence-Para Coherence: 0.603 0.50
Sentence-Sentence Coherence: 0.061 0.07
Number of Paragraphs: 4 4