The maps below show the changes in a town after the construction of a hydroelectric power dam.
The pictures depict a number of important changes which took place in a town after being constructed a hydroelectric power dam over the course of 10 years starting in 1990.
From the maps, the town has undergone significant changes. The most noticeable change that occurred in the town was that of a huge lake. This infrastructure change has taken place at the expense of forest, ancient structure and farmlands.
In 1990, there was an ancient structure and a forest with rare flora and fauna to the west of the river, and irrigated farmlands to the east. However, with the construction of a dam wall, those features disappeared beneath a large lake, which also became a fishing areain2010.
Post date | Users | Rates | Link to Content |
---|---|---|---|
2020-11-06 | minthechew | 92 | view |
- In most parts of the world the volume of traffic is growing at an alarming rate In the form of an assignment discuss the main traffic problems in your country Please provide with their causes and possible solutions 84
- In most successful organizations some people believe that communications between managers and workers is important other people said that other factors are more important What is your opinion 73
- The maps below show the changes in a town after the construction of a hydroelectric power dam
- The charts below show the percentage of volunteers by organizations in 2008 and 2014 47
- New technologies have changed the way children spend their free time Do the advantages outweigh the disadvantages 84